Services Include:
- Environmental Document Preparation
- Categorical Exclusions
- Environmental Assessments
- Environmental Impact Statements
- Transportation Design including:
- Intersection Improvements
- Bridge Replacements
- Interchanges
- Adding Lanes
- New Location
- Traffic Studies
- Parking Facilities
- Work Zone Traffic Control
- Construction Engineering
Related Experience:
- State Route 21, Talladega County, AL for ALDOT:
Project Director for surveying, environmental documents, corridor study
and preparation of contract plans and right of way documents for rural
widening of the existing SR-21 from a two lane to a four lane divided
between Sylacauga and Talladega (16 miles).
- State Route SR118, Marion County, AL for ALDOT:
Project Manager for surveying and plan preparation of contract plans
and right of way documents for widening and reconstruction of SR-118
between Guin and Winfield (11 mi.).
- Birmingham Northern Beltline, Jefferson County, AL for ALDOT:
Project Director for Functional design plans on nine miles of new
location interstate with three interchanges including one Route to
Route interchange.
- State Route 261, Shelby County, AL for ALDOT:
Project Director for surveying, environmental documents, corridor study
and preparation of contract plans and right of documents for urban
widening of an existing 2 lane facility to a five lane. (3.3 miles).
- US 82, Tuscaloosa County, AL for ALDOT: Project manager for preparation of contract plans for urban widening of the existing four lane to a six lane for 2.2 miles.
- Garvee Bond Bridge Replacement Projects: Project Manager for bridge replacement projects in Jefferson, Lauderdale, Marshall, and Winston Counties.
- US 51 Widening in North Grenada, Grenada County, MS for MDOT:
Responsible for preparing the environmental document for this project.
This included coordinating and compiling information and studies
required to prepare the environmental document and participating in the
public hearing and answering citizens questions about the proposed
project.. This project was significant in that the design criteria for
the route was satisfied while Section 4(f) impacts to a historic
district and a public park were avoided.
- East Harrison County Connector, Harrison County, MS for MDOT:
Involved with the preparation of the Environmental Impact Statement
(EIS) for a route in Biloxi, MS, that will connect US 90 to I-10. This
project was challenging because of the numerous environmental
constraints present on the Mississippi Gulf Coast. The resources
impacted on this project included endangered species, historic
properties, Keesler Air Force Base, wetlands, hazardous wastes sites,
navigation waterways, and relocations.
- I-69 Environmental Studies in Mississippi for MDOT:
Involved in the initial studies for the I-69 corridor through the
Mississippi Delta and for the segment connecting Mississippi and
Tennessee.
|